National service hotline:

+86 18242265349

News

Contact

Address: No. 1271, Lincheng Street, High-tech Zone, Anshan City, Liaoning Province

Contact: Manager Wang

Mobile: +86 18242265349

Fixed telephone/fax: +86 0412-6459300

Free consultation hotline: +86 18242265349

Email: Lnxskj@163.COM

QQ: 3480545031

Website:  en.lnxskjgs.cn 

Website: www.lnxskjgs.cn


Anshan iron & steel co., LTD. : A total of 100 million yuan was achieved (using our products)

Your current location: Home >> News >> Company News

Anshan iron & steel co., LTD. : A total of 100 million yuan was achieved (using our products)

Date of release:2019-01-19 Author: Click:

How does the digital coal and rock analysis maintain the equipment of coal and rock analysis

One: The size of the test bed.The size of the test bed should be built according to the style of the test equipment. A reasonable structure can greatly improve the work efficiency and reduce the fatigue degree.If conditions permit, you can buy a professional test bed.

Two: LocationIn general, our test bed is not allowed to be built in a place where direct sunlight and air convection are available.Because strong light exposure will make the temperature measurement inaccurate, and shorten the service life of electronic components.Air convection will also make the temperature and humidity lost, dust sample even floating.Result in deviation of test results.

Three: The temperatureDomestic latitude and longitude deviation is very large, there are very few areas during the day there is also a great temperature difference, in the absence of indoor constant temperature and humidity equipment, should try to manually adjust the test temperature, so as to avoid adverse effects on the instrument.

Four:Basic facilities

1. Grounding.Coal quality analysis equipment must be grounded wire, pay attention to the use of safety, lest the instrument leakage or voltage instability causes damage to the instrument or even laboratory staff injured.

2. Power off protection device.The same is for the safety point of view, is one of the test bed necessary facilities.

3. Power supply.Should choose sufficient and high quality power supply.

4. UBS.Some tests are extremely long and complex to prepare.Often a sudden power failure will cause the work can not be completed, there is a good backup power supply to complete the work on time.

5. Test water.The pool should be far enough away from the electronic equipment and not leak.

6. Routine maintenance.Cleaning, drying, good insulation performance is the goal of daily maintenance.Maintaining the test bed as part of your daily work schedule will only make your work more efficient.


The address of this article:http://en.lnxskjgs.cn/news/390.html

Key word:

Address: No. 1271, Lincheng Street, High-tech Zone, Anshan City, Liaoning Province

Tel: +86 18242265349

1556283218139250.png

【Mobile station】
  • Service
  • number
    15642202798
  • Message
  • web site
  • Online Service
    Please leave a message for us
    Please input the message here, and we will contact you as soon as possible.
    name
    Contacts
    Telephone
    Telephone
    mailbox
    mailbox
    address
    address